What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 141 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £119.10 |
| 2 | Dong Severn Ut 10 | £96.64 |
| 3 | Spalding | £70.96 |
| 4 | Rake Lane | £66.18 |
| 5 | Carrington Ltd - 2 | £65.35 |
| 6 | Centrica Business Solutions S05L | £62.77 |
| 7 | Unit 3 | £60.12 |
| Region | £/MWh |
|---|---|
| North Western | £46.0 |
| South Scotland | £45.6 |
| Eastern | £40.3 |
| Yorkshire | £40.1 |
| Midlands | £37.6 |
| Southern | £32.7 |