What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 42 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | BGI Trading #01 | £22.00 |
| 2 | Cottam Development Centre | £20.38 |
| 3 | Dong Severn Ut 10 | £18.00 |
| 4 | Ferrybridge-2 | £15.00 |
| 5 | Ilmer Lane | £14.33 |
| 6 | Contego | £14.03 |
| 7 | Native River | £13.49 |
| Region | £/MWh |
|---|---|
| Yorkshire | £15.0 |
| South Eastern | £12.2 |
| North Scotland | £10.2 |
| Eastern | £10.1 |
| South Scotland | £8.1 |
| Southern | £6.0 |
| South Western | £5.9 |