What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 11 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Holes Bay | £90.50 |
| 2 | Immingham | £80.55 |
| 3 | UK Power Reserve #08 | £77.92 |
| 4 | UKPR MANW | £77.89 |
| 5 | UKPR East Mids | £75.00 |
| 6 | UKPR S East | £73.84 |
| 7 | Lakeside | £73.63 |