What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 34 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £76.75 |
| 2 | Carrington Ltd - 1 | £67.13 |
| 3 | UKPR MANW | £67.13 |
| 4 | UK Power Reserve #08 | £67.13 |
| 5 | Ferrybridge-2 | £66.10 |
| 6 | BGI Trading #03 | £64.03 |
| 7 | Bloxwich | £62.93 |
| Region | £/MWh |
|---|---|
| Northern | £57.2 |
| Yorkshire | £55.7 |
| South Wales | £55.7 |
| North Western | £54.8 |
| Midlands | £51.8 |
| South Western | £51.5 |
| Eastern | £47.7 |
| South Eastern | £44.9 |
| Southern | £44.1 |
| East Midlands | £35.3 |
| Merseyside and North Wales | £31.2 |