What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 17 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Optimo Energy T01N | £59.72 |
| 2 | GridBeyond L0DN | £18.10 |
| 3 | GridBeyond L0EN | £18.10 |
| 4 | Ferrybridge-2 | £16.44 |
| 5 | Whitebirk | £15.35 |
| 6 | THURROCK STORAGE #3 | £14.36 |
| 7 | Ilmer Lane | £14.04 |
| Region | £/MWh |
|---|---|
| North Western | £14.8 |
| South Eastern | £14.2 |
| Southern | £14.0 |
| Eastern | £14.0 |
| South Scotland | £13.5 |