What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 51 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Centrica Business Solutions S05L | £5.43 |
| 2 | Brigg | £5.02 |
| 3 | Lakeside | £3.69 |
| 4 | Monk Fryston | £3.68 |
| 5 | Carrington Ltd - 2 | £3.59 |
| 6 | Ocker Hill | £3.35 |
| 7 | Bloxwich | £3.26 |
| Region | £/MWh |
|---|---|
| Yorkshire | £3.8 |
| Midlands | £3.3 |
| Eastern | £2.6 |
| North Western | £2.1 |
| South Wales | £1.8 |
| Southern | £1.7 |