What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 17 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Shoreham | £485.02 |
| 2 | Dong Severn Ut 10 | £428.40 |
| 3 | Ferrybridge-2 | £198.47 |
| 4 | Ferrybridge-1 | £198.36 |
| 5 | Unit 2 | £128.63 |
| 6 | BMUid for Sutton Bridge | £95.34 |
| 7 | Sizing John | £68.75 |
| Region | £/MWh |
|---|---|
| Eastern | £68.4 |
| South Western | £66.6 |
| Southern | £21.3 |
| Midlands | £8.1 |
| North Western | £0.0 |
| South Wales | £0.0 |