What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 23 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Staythorpe 4 | £22.50 |
| 2 | Shoreham | £21.33 |
| 3 | Dong Severn Ut 10 | £20.52 |
| 4 | Burwell 1 | £17.88 |
| 5 | BESS Holdco 2 EN7H | £17.53 |
| 6 | Brentwood | £17.53 |
| 7 | Carrington Ltd - 1 | £16.92 |
| Region | £/MWh |
|---|---|
| South Wales | £16.1 |
| North Western | £15.7 |
| Yorkshire | £14.8 |
| Northern | £14.7 |
| Southern | £14.6 |
| Eastern | £14.6 |
| Merseyside and North Wales | £14.3 |
| Midlands | £14.3 |
| South Eastern | £14.3 |
| South Western | £13.8 |
| East Midlands | £13.2 |