What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 104 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Kilmarnock South | £6.26 |
| 2 | Brook Farm | £6.00 |
| 3 | UK Power Reserve #08 | £6.00 |
| 4 | Shoreham | £5.21 |
| 5 | BESS Holdco 2 EN7H | £5.05 |
| 6 | GridBeyond L0DN | £5.03 |
| 7 | GridBeyond L0EN | £5.03 |
| Region | £/MWh |
|---|---|
| South Scotland | £6.3 |
| Eastern | £5.6 |
| Southern | £4.9 |
| South Eastern | £4.5 |
| North Western | £4.2 |