What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 44 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Drax | £36.71 |
| 2 | Seabank Module 2 | £35.91 |
| 3 | Centrica Business Solutions S05L | £27.26 |
| 4 | Lakeside | £16.21 |
| 5 | Zenobe Capenhurst #4 | £15.25 |
| 6 | Staythorpe 1 | £14.87 |
| 7 | Ocker Hill | £14.76 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £15.3 |
| Midlands | £14.8 |
| Yorkshire | £14.2 |
| North Western | £11.3 |
| South Eastern | £11.1 |
| Eastern | £11.0 |
| Southern | £9.7 |