What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 29 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £5.67 |
| 2 | UK Power Reserve #08 | £5.00 |
| 3 | F & S Energy #03 | £4.70 |
| 4 | Ferrybridge-1 | £4.62 |
| 5 | Whitebirk | £4.57 |
| 6 | Chapel Farm | £4.50 |
| 7 | THURROCK STORAGE #1 | £4.48 |
| Region | £/MWh |
|---|---|
| Yorkshire | £4.2 |
| South Wales | £4.1 |
| Eastern | £3.7 |
| South Eastern | £3.5 |
| North Western | £2.7 |
| Midlands | £2.4 |
| Southern | £2.3 |
| South Western | £1.8 |