What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 17 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Staythorpe 3 | £43.13 |
| 2 | Staythorpe 4 | £40.00 |
| 3 | Dong Severn Ut 20 | £23.95 |
| 4 | GridBeyond L0DN | £23.95 |
| 5 | GridBeyond L0EN | £23.95 |
| 6 | ECOTRICITY C05L | £19.16 |
| 7 | THURROCK STORAGE #2 | £14.83 |
| Region | £/MWh |
|---|---|
| South Eastern | £14.5 |
| Eastern | £12.6 |
| Southern | £11.9 |
| North Western | £11.9 |
| Merseyside and North Wales | £10.7 |
| South Western | £10.5 |