What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 28 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | ECOTRICITY C05L | £32.76 |
| 2 | Dong Severn Ut 20 | £25.03 |
| 3 | GridBeyond L0DN | £25.00 |
| 4 | GridBeyond L0EN | £25.00 |
| 5 | UKPR S East | £20.03 |
| 6 | Broadditch | £15.51 |
| 7 | ClayTye Farm 2 | £15.50 |
| Region | £/MWh |
|---|---|
| South Eastern | £15.5 |
| Eastern | £15.4 |
| Merseyside and North Wales | £15.1 |
| South Scotland | £12.2 |
| North Scotland | £11.5 |