What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 16 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Capenhurst | £3.56 |
| 2 | UK Power Reserve #08 | £2.61 |
| 3 | Tebworth Park | £2.42 |
| 4 | Sizing John | £2.39 |
| 5 | Native River | £2.39 |
| 6 | F & S Energy #03 | £2.34 |
| 7 | Lakeside | £2.31 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £3.6 |
| South Western | £2.4 |
| Yorkshire | £1.6 |
| Midlands | £1.6 |
| South Eastern | £1.3 |
| Northern | £1.1 |
| Eastern | £1.0 |
| North Western | £0.9 |
| Southern | £0.5 |
| South Wales | £0.5 |