What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 30 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Capenhurst | £13.03 |
| 2 | Enfield Centre Ltd BMU1 | £12.61 |
| 3 | Tye Lane | £11.81 |
| 4 | SUNDON | £11.79 |
| 5 | Pillswood 1 | £11.75 |
| 6 | Lakeside | £11.23 |
| 7 | BREDBURY | £10.99 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £13.0 |
| Yorkshire | £11.2 |
| Midlands | £10.6 |
| North Western | £10.6 |
| Eastern | £10.6 |
| Southern | £10.5 |
| South Western | £10.2 |
| South Eastern | £10.2 |