What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 33 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Monk Fryston | £43.68 |
| 2 | Lakeside | £42.77 |
| 3 | Tye Lane | £41.97 |
| 4 | Ocker Hill | £41.48 |
| 5 | Carrington Ltd - 2 | £41.11 |
| 6 | Cowley | £40.26 |
| 7 | SUNDON | £40.03 |
| Region | £/MWh |
|---|---|
| Yorkshire | £43.1 |
| Eastern | £41.4 |
| Midlands | £41.1 |
| South Eastern | £40.3 |
| North Western | £39.8 |
| Southern | £38.2 |