What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 49 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | SSE Energy Supply #01 | £10.37 |
| 2 | Pillswood 2 | £8.43 |
| 3 | Monk Fryston | £8.39 |
| 4 | Lakeside | £8.16 |
| 5 | Carnegie Road 1 | £8.10 |
| 6 | Ocker Hill | £7.56 |
| 7 | Tebworth Park | £7.15 |
| Region | £/MWh |
|---|---|
| Midlands | £7.2 |
| Eastern | £6.9 |
| Northern | £6.8 |
| Yorkshire | £6.6 |
| South Eastern | £5.3 |
| Merseyside and North Wales | £5.2 |
| North Western | £5.0 |
| South Wales | £4.6 |
| Southern | £4.6 |