What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 36 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | SSE Energy Supply #01 | £23.25 |
| 2 | Capenhurst | £21.90 |
| 3 | Tye Lane | £21.90 |
| 4 | SUNDON | £21.69 |
| 5 | BREDBURY | £21.63 |
| 6 | Nursling | £21.54 |
| 7 | Limejump Energy #01 | £21.37 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £21.5 |
| Midlands | £20.7 |
| Eastern | £20.6 |
| Yorkshire | £18.9 |
| Northern | £18.1 |
| South Wales | £18.1 |
| Southern | £17.7 |
| South Eastern | £17.4 |
| North Western | £17.4 |