What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 84 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Tye Lane | £10.25 |
| 2 | Pivot Kemsley | £8.60 |
| 3 | SUNDON | £8.53 |
| 4 | Pivot Bustleholme | £8.21 |
| 5 | Pivot Coventry | £7.62 |
| 6 | Nursling | £7.56 |
| Region | £/MWh |
|---|---|
| Eastern | £9.6 |
| South Eastern | £8.6 |
| Midlands | £8.2 |
| Southern | £7.6 |