What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 80 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | F & S Energy #03 | £2.69 |
| 2 | Pillswood 1 | £2.60 |
| 3 | Ferrybridge-1 | £2.45 |
| 4 | Ferrybridge-2 | £2.45 |
| 5 | Immingham | £2.36 |
| 6 | Tye Lane | £2.33 |
| 7 | Shoreham | £2.23 |