What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 43 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Staythorpe 2 | £7.29 |
| 2 | Staythorpe 1 | £7.29 |
| 3 | Staythorpe 4 | £6.75 |
| 4 | Sizing John | £5.43 |
| 5 | F & S Energy #03 | £5.41 |
| 6 | Ferrybridge-2 | £5.40 |
| 7 | Ferrybridge-1 | £5.31 |
| Region | £/MWh |
|---|---|
| South Western | £3.8 |
| Eastern | £3.8 |
| Yorkshire | £3.6 |
| North Western | £3.3 |
| South Wales | £3.0 |
| South Eastern | £2.7 |
| Northern | £2.7 |
| Southern | £1.9 |
| Midlands | £0.9 |