What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 44 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Lakeside | £22.46 |
| 2 | Carrington Ltd - 2 | £22.25 |
| 3 | Limejump Energy #05 | £21.63 |
| 4 | SUNDON | £21.00 |
| 5 | Brigg | £20.71 |
| 6 | Nursling | £19.80 |
| 7 | Limejump Energy #02 | £19.67 |
| Region | £/MWh |
|---|---|
| South Eastern | £16.9 |
| Eastern | £13.5 |
| Yorkshire | £12.6 |
| North Western | £10.3 |
| Southern | £9.8 |
| Merseyside and North Wales | £9.6 |
| South Wales | £9.2 |
| Midlands | £7.7 |