What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 7 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Marchwood | £12.08 |
| 2 | SOUTH HUMBER BANK P/S | £11.85 |
| 3 | Carrington Ltd - 2 | £8.71 |
| 4 | Lakeside | £7.80 |
| 5 | Monk Fryston | £7.80 |
| 6 | Ocker Hill | £6.91 |
| 7 | Skelmersdale | £5.75 |
| Region | £/MWh |
|---|---|
| Yorkshire | £7.8 |
| Midlands | £6.9 |
| North Western | £5.7 |
| Eastern | £4.0 |
| Southern | £2.6 |