What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 5 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Sizing John | £35.92 |
| 2 | Tebworth Park | £35.38 |
| 3 | Immingham CHP | £22.79 |
| 4 | Shoreham | £22.13 |
| 5 | F & S Energy #02 | £16.60 |
| 6 | THURROCK STORAGE #1 | £13.75 |
| 7 | Pillswood 2 | £13.39 |
| Region | £/MWh |
|---|---|
| South Eastern | £13.7 |
| North Western | £9.4 |
| Yorkshire | £9.3 |
| Eastern | £8.8 |
| Southern | £8.3 |
| Northern | £7.5 |