What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 1 accepted unit with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £11.00 |
| 2 | Peterhead Block 1 | £5.16 |
| 3 | Tye Lane | £2.88 |
| 4 | Nursling | £2.72 |
| 5 | Statkraft Markets #4 | £2.46 |
| 6 | Didcot B main 6 | £2.46 |
| 7 | Little Barford main 1 | £2.46 |
| Region | £/MWh |
|---|---|
| Eastern | £2.9 |
| Southern | £2.7 |
| North Western | £2.2 |