What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 63 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Grain | £43.79 |
| 2 | Carrington Ltd - 2 | £37.07 |
| 3 | Lakeside | £36.27 |
| 4 | Monk Fryston | £35.85 |
| 5 | Newport | £34.93 |
| 6 | Ocker Hill | £34.44 |
| 7 | Damhead Creek | £32.46 |
| Region | £/MWh |
|---|---|
| Yorkshire | £36.2 |
| South Wales | £34.9 |
| Midlands | £30.8 |
| South Eastern | £30.0 |
| Southern | £28.8 |
| Eastern | £28.2 |
| North Western | £25.8 |