What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 71 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £58.00 |
| 2 | Seabank Module | £55.93 |
| 3 | Grain | £50.03 |
| 4 | Chapel Farm | £47.30 |
| 5 | Carrington Ltd - 2 | £44.00 |
| 6 | Lakeside | £39.83 |
| 7 | Thame Road | £39.80 |
| Region | £/MWh |
|---|---|
| Northern | £35.6 |
| South Eastern | £34.9 |
| Yorkshire | £33.1 |
| Eastern | £32.5 |
| South Western | £30.5 |
| Merseyside and North Wales | £29.9 |
| Midlands | £29.4 |
| Southern | £29.4 |