What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 27 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | UKPR East Mids | £129.47 |
| 2 | UKPR S East | £129.29 |
| 3 | West Burton B | £127.32 |
| 4 | Keadby-2 Main | £125.32 |
| 5 | EDF Energy F01C | £124.93 |
| 6 | BREDBURY | £122.61 |
| 7 | Mannington | £116.40 |
| Region | £/MWh |
|---|---|
| North Western | £104.3 |
| South Eastern | £101.8 |
| Southern | £100.7 |
| East Midlands | £93.4 |
| Midlands | £83.6 |
| Yorkshire | £81.1 |
| Northern | £80.9 |
| South Wales | £79.7 |
| South Western | £77.8 |
| Eastern | £75.7 |