What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 54 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Shoreham | £128.88 |
| 2 | SOUTH HUMBER BANK P/S | £127.71 |
| 3 | Flexitricity #04 | £125.89 |
| 4 | Octopus Energy #01 | £125.49 |
| 5 | Octopus Energy #01 | £125.49 |
| 6 | Octopus Energy #01 | £125.49 |
| 7 | Octopus Energy #01 | £125.49 |
| Region | £/MWh |
|---|---|
| Northern | £120.2 |
| East Midlands | £113.7 |
| North Western | £103.2 |
| South Wales | £101.1 |
| Southern | £101.0 |
| Midlands | £100.0 |
| South Western | £98.0 |
| Eastern | £96.0 |
| Yorkshire | £93.7 |