What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 12 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Dinorwig | £100.00 |
| 2 | Octopus Energy #01 | £100.00 |
| 3 | Octopus Energy #01 | £100.00 |
| 4 | Octopus Energy #01 | £100.00 |
| 5 | Octopus Energy #01 | £100.00 |
| 6 | Octopus Energy #01 | £100.00 |
| 7 | Octopus Energy #01 | £100.00 |
| Region | £/MWh |
|---|---|
| Southern | £91.0 |
| North Western | £86.4 |
| Eastern | £84.3 |
| Yorkshire | £80.1 |
| Merseyside and North Wales | £76.5 |
| South Eastern | £76.2 |
| South Wales | £72.0 |
| Midlands | £67.3 |
| East Midlands | £66.7 |
| South Western | £64.1 |