What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 9 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Melksham | £13.79 |
| 2 | Hirwaun | £13.79 |
| 3 | Monk Fryston | £10.73 |
| 4 | Didcot B main 5 | £8.33 |
| 5 | Ocker Hill | £6.44 |
| 6 | Flexitricity #01 | £5.25 |
| 7 | Dollymans | £4.70 |
| Region | £/MWh |
|---|---|
| Southern | £13.8 |
| South Wales | £13.8 |
| Yorkshire | £10.7 |
| Midlands | £6.4 |
| Eastern | £4.7 |
| South Eastern | £4.7 |