What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 45 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Tebworth Park | £21.00 |
| 2 | EDF Aggregated Unit 05 | £20.62 |
| 3 | Sizing John | £20.43 |
| 4 | Tye Lane | £19.95 |
| 5 | Lakeside | £19.53 |
| 6 | Monk Fryston | £19.35 |
| 7 | SUNDON | £19.28 |
| Region | £/MWh |
|---|---|
| Eastern | £19.2 |
| Yorkshire | £19.2 |
| Midlands | £19.0 |
| East Midlands | £17.4 |
| Merseyside and North Wales | £16.9 |
| South Eastern | £16.5 |
| Southern | £14.9 |
| South Western | £13.1 |