What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Immingham CHP | £1179.77 |
| 2 | Keadby-2 Main | £685.00 |
| 3 | UKPR MANW | £637.67 |
| 4 | UKPR S East | £625.18 |
| 5 | UKPR East Mids | £617.00 |
| 6 | Lakeside | £597.80 |
| 7 | BREDBURY | £596.84 |
| Region | £/MWh |
|---|---|
| North Western | £596.8 |
| Yorkshire | £595.4 |
| South Eastern | £575.7 |
| Southern | £450.5 |
| Northern | £387.7 |
| Eastern | £386.4 |