What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 39 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pembroke 41 | £23.50 |
| 2 | Shoreham | £19.23 |
| 3 | Tebworth Park | £19.13 |
| 4 | F & S Energy #03 | £18.36 |
| 5 | BMUid for Sutton Bridge | £17.71 |
| 6 | Pillswood 2 | £17.70 |
| 7 | Carrington Ltd - 2 | £17.65 |
| Region | £/MWh |
|---|---|
| Yorkshire | £17.3 |
| North Western | £17.0 |
| South Eastern | £16.4 |
| Southern | £16.0 |
| Midlands | £15.7 |
| Eastern | £14.8 |