What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 47 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | F & S Energy #03 | £8.87 |
| 2 | SUNDON | £8.70 |
| 3 | Tye Lane | £8.67 |
| 4 | EDF Aggregated Unit 05 | £8.25 |
| 5 | Pivot Kemsley | £8.00 |
| 6 | Lakeside | £7.79 |
| 7 | Monk Fryston | £7.67 |
| Region | £/MWh |
|---|---|
| Eastern | £8.2 |
| South Eastern | £7.6 |
| Yorkshire | £7.4 |
| Midlands | £7.3 |
| North Western | £6.8 |
| South Wales | £6.7 |
| Southern | £6.7 |