What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 38 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Limejump Energy #01 | £15.25 |
| 2 | Brigg | £14.71 |
| 3 | Dinorwig | £14.51 |
| 4 | Zenobe Capenhurst #4 | £14.33 |
| 5 | ClayTye Farm 2 | £14.07 |
| 6 | Richborough Park 2 | £13.90 |
| 7 | Flexitricity #01 | £13.38 |
| Region | £/MWh |
|---|---|
| South Eastern | £13.9 |
| North Western | £12.4 |
| Yorkshire | £11.7 |
| Eastern | £11.7 |
| Northern | £11.2 |
| Southern | £9.8 |
| Merseyside and North Wales | £9.4 |
| Midlands | £8.3 |