What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 31 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £15.41 |
| 2 | F & S Energy #03 | £14.00 |
| 3 | Sizing John | £13.67 |
| 4 | Tye Lane | £12.85 |
| 5 | SUNDON | £10.64 |
| 6 | Lakeside | £9.87 |
| 7 | Pivot Bustleholme | £9.70 |
| Region | £/MWh |
|---|---|
| Eastern | £12.4 |
| Yorkshire | £8.8 |
| South Western | £8.7 |
| South Eastern | £8.2 |
| Midlands | £8.2 |
| Northern | £6.4 |
| Merseyside and North Wales | £5.7 |
| Southern | £5.5 |
| East Midlands | £4.0 |