What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 22 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £4.41 |
| 2 | Statkraft Markets #4 | £3.42 |
| 3 | Tye Lane | £3.01 |
| 4 | BMUid for Sutton Bridge | £2.68 |
| 5 | Swangate | £2.66 |
| 6 | Buxton | £2.63 |
| 7 | BREDBURY | £2.54 |
| Region | £/MWh |
|---|---|
| Eastern | £2.7 |
| Yorkshire | £2.7 |
| North Western | £2.6 |
| Southern | £2.1 |
| Northern | £2.1 |
| Midlands | £2.1 |
| South Western | £1.9 |