What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 21 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Tye Lane | £35.55 |
| 2 | Swangate | £35.29 |
| 3 | THURROCK STORAGE #1 | £34.29 |
| 4 | F & S Energy #03 | £33.33 |
| 5 | ClayTye Farm 1 | £32.67 |
| 6 | Ilmer Lane | £32.33 |
| 7 | Chapel Farm | £32.19 |
| Region | £/MWh |
|---|---|
| Yorkshire | £35.1 |
| Eastern | £34.2 |
| South Wales | £31.8 |
| Southern | £30.2 |
| Midlands | £28.2 |
| South Eastern | £26.8 |