What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 10 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
| Region | £/MWh |
|---|---|
| Yorkshire | £3.6 |
| North Western | £3.0 |
| Southern | £2.8 |
| Eastern | £2.4 |
| South Eastern | £2.4 |