What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 49 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | BMUid for Sutton Bridge | £8.14 |
| 2 | Unit 1 | £8.00 |
| 3 | Didcot B main 6 | £7.00 |
| 4 | Marchwood | £6.50 |
| 5 | BGI Trading #1 | £6.39 |
| 6 | Exergy Solutions E00E | £6.15 |
| 7 | Lakeside | £6.05 |
| Region | £/MWh |
|---|---|
| Yorkshire | £6.0 |
| Midlands | £5.6 |
| Southern | £5.5 |
| South Eastern | £5.4 |
| Eastern | £5.4 |
| North Western | £5.4 |
| South Western | £5.3 |