What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 43 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Lakeside | £20.69 |
| 2 | BREDBURY | £19.42 |
| 3 | EDF Energy F01C | £19.37 |
| 4 | Gerrards Cross | £19.10 |
| 5 | HawkersHill | £19.00 |
| 6 | Unit 2 | £18.53 |
| 7 | EDFE Aggregate S Eng 02 | £18.33 |
| Region | £/MWh |
|---|---|
| North Western | £18.4 |
| Yorkshire | £17.1 |
| Eastern | £14.6 |
| Midlands | £14.4 |
| Merseyside and North Wales | £13.2 |
| South Eastern | £11.7 |
| East Midlands | £10.9 |
| Southern | £10.3 |