What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 16 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Lakeside | £1.39 |
| 2 | Swangate | £1.21 |
| 3 | EDF Aggregated Unit 05 | £1.19 |
| 4 | Monk Fryston | £1.15 |
| 5 | Nursling | £1.11 |
| 6 | Pivot Bustleholme | £1.07 |
| 7 | Pillswood 2 | £1.06 |
| Region | £/MWh |
|---|---|
| Yorkshire | £1.2 |
| Southern | £1.1 |
| Midlands | £1.1 |
| Merseyside and North Wales | £1.0 |
| South Eastern | £1.0 |
| Eastern | £0.7 |