What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 28 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Tye Lane | £7.53 |
| 2 | Tebworth Park | £6.92 |
| 3 | BREDBURY | £6.91 |
| 4 | Sizing John | £6.81 |
| 5 | F & S Energy #03 | £6.76 |
| 6 | Pillswood 1 | £6.71 |
| 7 | Pivot Coventry | £6.40 |
| Region | £/MWh |
|---|---|
| North Western | £6.9 |
| Eastern | £6.7 |
| Yorkshire | £6.2 |
| Midlands | £6.1 |
| South Eastern | £5.5 |
| South Western | £5.4 |
| Southern | £4.5 |