What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 23 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 2 | £207.00 |
| 2 | Tebworth Park | £205.80 |
| 3 | Sizing John | £205.53 |
| 4 | F & S Energy #03 | £202.35 |
| 5 | SUNDON | £184.44 |
| 6 | Pivot Coventry | £181.35 |
| 7 | Pillswood 2 | £176.25 |
| Region | £/MWh |
|---|---|
| South Western | £170.5 |
| Merseyside and North Wales | £167.7 |
| South Eastern | £143.3 |
| Eastern | £139.5 |
| South Wales | £131.9 |
| Yorkshire | £116.6 |
| Midlands | £116.4 |
| Southern | £109.3 |