What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 34 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDFE Aggregate S Eng 02 | £103.09 |
| 2 | EDF Energy F01C | £101.10 |
| 3 | SUNDON | £99.14 |
| 4 | Larks Green | £97.06 |
| 5 | Sizing John | £88.10 |
| 6 | Wormald Green | £88.08 |
| 7 | F & S Energy #03 | £86.38 |
| Region | £/MWh |
|---|---|
| South Western | £97.1 |
| Northern | £88.1 |
| Yorkshire | £81.1 |
| Merseyside and North Wales | £79.2 |
| Eastern | £67.7 |
| South Wales | £63.1 |
| Southern | £59.2 |
| South Eastern | £57.9 |
| North Western | £55.0 |
| Midlands | £47.7 |