What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 7 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Marchwood | £8.11 |
| 2 | Skelmersdale | £7.12 |
| 3 | Unit 2 | £6.76 |
| 4 | Lakeside | £6.72 |
| 5 | BGI Trading #1 | £6.69 |
| 6 | BREDBURY | £6.10 |
| 7 | Oldham | £5.97 |
| Region | £/MWh |
|---|---|
| North Western | £6.5 |
| Yorkshire | £6.2 |
| Southern | £5.4 |
| South Eastern | £5.4 |
| Midlands | £4.6 |
| South Wales | £4.5 |
| Eastern | £3.9 |