What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 25 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £7.19 |
| 2 | Sizing John | £6.97 |
| 3 | Cottam Development Centre | £6.89 |
| 4 | Grain | £6.83 |
| 5 | Immingham CHP | £6.39 |
| 6 | SSE Energy Supply #01 | £6.33 |
| 7 | Lakeside | £6.12 |
| Region | £/MWh |
|---|---|
| Eastern | £6.9 |
| Yorkshire | £6.1 |
| North Western | £6.1 |
| Midlands | £5.5 |
| Southern | £4.9 |