What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 26 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Exergy Solutions E00E | £26.52 |
| 2 | BMUid for Sutton Bridge | £25.01 |
| 3 | West Burton B 2 | £21.38 |
| 4 | Centrica Business Solutions S06B | £16.90 |
| 5 | Pillswood 1 | £16.67 |
| 6 | THURROCK STORAGE #1 | £16.65 |
| 7 | Lakeside | £16.65 |
| Region | £/MWh |
|---|---|
| Yorkshire | £16.7 |
| South Eastern | £16.7 |
| Southern | £14.2 |
| Merseyside and North Wales | £13.8 |
| Eastern | £12.3 |
| East Midlands | £10.7 |
| Northern | £8.8 |
| South Western | £5.2 |