What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 15 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Carrington Ltd - 2 | £6.89 |
| 2 | Brigg | £6.50 |
| 3 | Unit 3 | £6.30 |
| 4 | THURROCK STORAGE #1 | £6.26 |
| 5 | Wormald Green | £6.00 |
| 6 | Burwell 1 | £6.00 |
| 7 | Pivot Kemsley | £6.00 |
| Region | £/MWh |
|---|---|
| Northern | £6.0 |
| South Eastern | £5.5 |
| Yorkshire | £5.5 |
| North Western | £5.5 |
| Midlands | £5.0 |
| Eastern | £4.9 |
| Southern | £4.8 |